Tag: 452718

  • 26/05/2025 – Bumper Bank Holiday

    26/05/2025 – Bumper Bank Holiday

    Hello and welcome to a bumper update from the team at Quorn; reporting on two weeks work on the TTA Tank 1919. It was also great to see the mixed goods running again for the popular Goods Experience event.

    Last week progress was made with the headstocks and sanding the tank barrel. The remains of the last stubborn sticker adhesive took a bit of removing.

    Two discarded picnic benches were recovered from Rothley and given some tlc. These will be put to good use by the team at Quorn.

    A donated vice was attached to the heavy framed workbench.

    This weekend started with a snapped brake release chord on the Dogfish in the mixed goods, which was given a temporary repair before Witherslack Hall arrived to take charge of the Goods Experience event train. The release chord will be fully replaced in due course.

    Work then continued on tank 1919, sanding, wire brushing, scraping and needle gunning the solebars.

    Followed by a coat of red-oxide primer; and a bit of much needed tlc for some paint brushes.

    With the needle gun out an opportunity was taken to clean up some of the Lowfit underframe.

    Monday and we were treated to a couple of customary Bank Holiday showers, however there were sufficient dry spells to continue with solebar and underframe scaping, wire brushing, sanding and red-oxide painting more areas on tank 1919.

    A bit of tree pruning was necessary to get a couple of overhanging branches clear of the tanks; of course firstly making absolutely sure there were no nesting birds.

    One of the theatrical prop bicycles was repaired using parts obtained from a local car boot sale. Some of the rod type brake linkage needed a bit of re-shaping to fit and operate smoothly.

    Tank 1919 is progressing much closer to being ready for undercoat painting, lets hope the weather is kind to us next week !

    Join us again next week when Quorn Station Yard will be busy with the 1940s Weekend, for full details see the GCR website here – https://tickets.gcrailway.co.uk/events/103217

    All the best, Dave

  • 11/05/2025 – All Hands to the Tank

    11/05/2025 – All Hands to the Tank

    Hello and welcome to a sunny weekend update from Quorn; we’ve continued with getting tank 1919 ready for paint and completed a small repair to part of the brake rigging on the Lowfit.

    Lowfit wagon B452718 is due to go to Rothley at some point for underframe repairs, in the meantime we need to progress other jobs which include a repair to a broken part of the brake rigging. One of the twin operating arms has a fractured spacer and a missing spacer. To make the repair easier, on Saturday the arm was removed from the wagon.

    The spacer attachment areas were cleaned up and a new spacer cut from a piece of tubing.

    The arm assembly was then clamped together and welded up.

    The rigging arm was then treated to a coat of red oxide primer, followed by a coat of gloss black.

    Dan continued with his work on the A-Type container, cleaning up more of the metalwork and applying red-oxide primer.

    The main focus for the weekend has been needle gunning, sanding and scraping of tank 1919 to progress closer to being able to apply paint.

    Where bare metal was revealed, red oxide primer was applied and when dry the north end headstock panel had grey undercoat.

    On Sunday the sanding and scraping continued on tank 1919, also a couple of areas on tanks 3621 and 3606 were attended to.

    Again any bare metal areas on all 3 tanks were treated to some red oxide primer.

    The repaired brake rigging arm was re-fitted to the Lowfit after straightening the locating pins.

    The sticker glue residue was removed from the west side of tank 1919.

    Next week with most of the team away, we’ll be taking a break from reporting any activity until we’re back for the Bank Holiday bumper weekend at the end of the month.

    Cheers for now, Dave