Tag: E301588

  • 01/11/26 – More on the Tube

    01/11/26 – More on the Tube

    Hello, as we head into November the LNER Tube wagon gets some more primer whilst the site has had a good tidy-up.

    Saturday Nick and Charlie spent most of the day sorting scrap timber, removing any metalwork and collating it onto the pile ready for adding to the bonfire.

    On Sunday Dan did a bit of signwriting on the West side of Shocvan B854782.

    Mark, Tom and Oliver continued with some needle gun cleaning of the metalwork on the LNER Tube wagon E301588.

    Ernie painted the four floor retention metal strips in gloss black.

    I salvaged the metalwork, nuts and bolts from the old replica open container parts that we’ve decided are too far gone to try and re-build. The rotten wood was consigned to the bonfire pile whilst a few of the more solid planks were stored away with the metalwork for future use.

    Mark, Tom and Oliver applied some red-oxide primer to the areas of the Tube wagon framework that they had cleaned up.

    It was great to see the LMS 8F 48305 back in traffic this weekend; looking the part during a visit into the yard at Quorn to shunt the van train.

    Thanks for reading, join us again soon, all the best, Dave

  • 25/10/26 – Not beaten by Storm Boelo

    25/10/26 – Not beaten by Storm Boelo

    Hello and welcome to a blustery weekend’s update from Quorn. The storm tried its best to remove the roof covering from a Vanwide while we make good progress with the LNER Tube wagon and find some more oily schmoo.

    Saturday Ross took shelter from the rain underneath Test Car 2 to remove the second brake cylinder.

    Whilst I worked inside the Test Car tiding up after we’d used the instrument area and kitchen for Esso Plate painting & varnishing through the summer.

    Nick and Ernie continued with some lamp repairs.

    With the brake cylinder removed Ross and myself cleaned up the mounting bolts and prepared a spreader plate and threaded rods ready to safely remove the cylinder end cover.

    Sunday was a much brighter and dryer day, however the wind was still prominent. On arrival into the yard we found that the storm overnight has made a good attempt at removing the roof covering from Vanwide B783082.

    This van is on our to-do list plan over the Christmas period to have the roof covering replaced; so in the meantime to make it safe, span-set straps were secured over what was left of the roof covering by Tom, Oliver and Dan.

    Ross and Charlie dismantled the second Test Car brake cylinder, much like the first, there was a lot of oily schmoo inside. Dan and Charlie helped clean up the cylinder and components.

    On inspection the cylinder seal isn’t in too bad a state however as it’s thought to have been in there for at least 20 years, not worked for 10 years, and the other cylinder needs replacing, it makes sense to get new seals them both.

    Nick, Ernie, Mark, Tom and Oliver continued with the work on the LNER Tube wagon E301588, cleaning up more of the underframe and the floor retention plate strips.

    Red oxide primer was then applied to the the majority of the cleaned up underframe areas as well as the plate strips.

    Dan and Charlie carried out some sticker & glue removal from Tank 1802 using the newly acquired special glue removal discs, which have proved very effective.

    Ross used the new digital measuring calipers to establish that the throat thickness of our spare wheelsets is sufficient to allow the wheelsets to be turned before they are re-used.

    Join us again soon, all the best, Dave

  • 11/10/26 – Shock Completion

    11/10/26 – Shock Completion

    This week the team at Quorn have finished the restoration of the Shoc-High and made a start on the LNER Tube wagon.

    Saturday started with Charlie finishing off lining the builders plate on the Shoc-High, and the East side paint symbol, whilst I applied the last of the bodyside stripes; quick drying undercoat first followed by gloss white.

    Nick and Thomas adjusted the brakes on the Shoc-High, where necessary removing and cleaning up linkage pins to ensure smooth and even operation; all parts of the linkage were then oiled-up.

    Charlie started up the vacuum brake rig, and with Ross’s help the brakes were successfully tested.

    Ross and Charlie then did a small maintenance job on the Volvo, adjusting the drive belts; I joined Ross to swap the distributor back to the original one on Test Car 2 which is part of the fault chasing challenge we have with the air brake system.

    Nick and Thomas progressed the sticker removal from tank 1802.

    The tank barrel end plate which had been removed previously was straightened and the number stickers removed.

    Ross and myself fitted the last six bodyside/end bolts to the Shoc-High, then painted them with Bauxite.

    Ross, Charlie and myself then got stuck into the very rotten floor removal from the LNER Tube E301588. The floor planks in these wagons are held in place by solebar top metal strip plates; the bolts attaching these were badly corroded so all had to be cut and punched out.

    By the end of Saturday afternoon the whole floor had been removed; some of this will no doubt go to help with the Bonfire on the 5th Nov; however a considerable amount fell into pieces and was just swept into a pile.

    On Sunday Ross and myself varnished the body of the Shoc-High wagon, protecting the solebar ends, then starting with the door edges, completing the bodysides then the ends.

    Charlie and myself cleared out the south end toilet in the mess coach with a view to using the sink for hand washing. A plywood shelf was cut and installed over the top of the toilet as this will not be used. At some point we will complete the plumbing from the coach’s main water tank.

    Ernie continued with his machining and assembly of the door locking bar parts for the Palshoc van.

    Nick, Mark, Tom, Oliver, Charlie and Thomas made their way down the yard to the van train to replace the rotten doors on 12T Van B763305 with those we’d prepared a few of weeks ago. The old doors were removed, some of the bolts needing a little help from the grinder.

    The door furniture parts were cleaned up then given a coat of primer.

    The new doors were trial fitted and measurements taken for fitting the door furniture.

    The door top noggin had to be adjusted slightly, and with the doors removed the apertures were routed and chiselled out to accept the door furniture parts.

    The first new door was then fitted, drilling the hinge bolt holes and bolting up.

    With the second door hung, we fitted the door locking bar so the van could be secured. The final door diagonal timbers, bolts, door furniture and door holdback catches will be a job for next weekend.

    Charlie and myself attended to a vacuum pipe clamp bolt replacement on the south end of the Shoc-High. The swan-neck is now secure.

    After our final inspection of the Shoc-High wagon we are happy to report that the restoration is essentially complete, with only a couple of missing split pins to be attended to before the wagon is released to the Carriage & Wagon department for operational acceptance inspection. We look forward to seeing the wagon in operation once it makes its way back into the mixed goods rake.

    Join us again next week, all the best, Dave