Hello everyone, and thanks for joining us for another update from Quorn. The autumn weather is definitely settling in, so we’ve been ticking jobs off the back burner list. During the week, Dan finished the signwriting on the LMS brakevan, which now leaves some underframe painting to finish.

With rain predicted on Saturday, I started looking at re-assembling the genset in the Test Car. Naturally, I started by taking it apart more… To re-attach the fuel pump, I wanted to check the timing on the geartrain, so ended up draining the coolant from the system and removed the radiator and water pump to gain access to the timing case. As I was removing components, Charlie took them outside and cleaned them with the pressure washer.

Nick and Ernie took a look at the drawer in the kitchen on the coach, which has been broken for a few months. The drawer was re-assembled with additional L brackets to re-attach the front of the drawer. Back in the generator room, I found broken wires on the magnetic pickup and the dynamo, which may have contributed to the issues with the generator.

On Sunday,we started by moving the barrels from E281882 back into B765272 to put them back into covered storage after Railways At Work.

We then moved onto some light landscaping, to clear an access ramp to get Danny up onto the dock to help in clearing that up.

I went back into the Test Car and finished piping up the fuel system, which leaves just the control actuators and the cooling system left to re-assemble. I also repaired the intermediate cover which had some loose rivets.

The light landscaping turned into heavy landscaping to fill in some of the ramp way to make it less steep for Danny, who eventually made it onto the dock.

Dan and I went to test the air brakes on the TEA tank, however part way through the test, it was found that one bow girder was not moving when the brakes were applied. We stopped the test and sent Dan under to lubricate and tap the linkages to free them. This didn’t remedy the seizing this weekend, so we’ll look at it again another time.