Hello everyone and welcome to this week’s update. We’ve focused on the Palvan this week, with the main push to get the roof boards on. Firstly, thank you for all your comments on the Palvan. We are aware of their mainline reputation and as such, the van will have a load and we are planning a wheelset swap as the profile on the current wheelsets would fail a fitness to run exam.
Nick went early to Harlow Brothers in Long Whatton to collect the four sheets of 10ft by 5ft plywood we use for the roof. Originally this would have been one big sheet of plywood, but somehow we struggle to find a source for those so make do with joining sheets together.


While Thomas Oliver and I cut the boards to the right sizes, Nick and the rest of the gang changed another buffer on the north end of the Palvan. The other buffer was found to be very soft, to the point of compressing when buffering up to the tool van.



With the sheets cut, we started to get them onto the roof, starting with the north end. The first sheet took quite some lining up, and we had to accept a squiffy side over hang to get the sheet square with the end of the van. Thankfully we can deal with this before the roof sheet is fitted.



The first sheet was bolted down, and a joining strip fixed to the loose end to aid in fitting the 2nd sheet. Dan and Tom painted the first sheet in an aluminium roof paint we’ve had kicking around for ages. The second sheet was fitted in short order and was bolted down in the failing daylight.


The last 2 sheets were bolted down on Sunday morning, and got a coat of paint. The last sheet needed some trimming due to the issues we’d had getting the first sheet lined up.

We then unfurled a lorry curtain and set Tom and Dan to removing the straps from the curtain. This was while I worked on trimming the board edges to remove the worst of the stepping between each board.

Once the strapping was removed, we cut a 20ft section from the curtain and got it onto the roof. There wasn’t time to fix it down, so we’ve used 3 ratchet straps to hold the roof sheet down while we get to fixing it.

Last job of the day was a tidy job, which involved 2 trips to the skip with Danny. Next week should be more of the same with either the roof sheet being fixed down, or a start made on stripping the side sheets out for replacement.