Hello everyone and welcome to this week’s update. This week, we’ve followed up the undercoat on 1919 with a gloss coat and continued the re-assembly of 3606.
1919 first then, although windy, Saturday was a perfect day for painting with it being dry and warm out so came the spray kit. With eight litres of thinned down paint, I applied a solid first coat to the tank barrel and sole bar all round, with the west side underframe getting a look in too.





Charlie cleaned up our spare direction switch for the Brush Pony trucks, and also cleaned up the top of the underframe on the Lowfit, making good work of the whole frame and applying some red oxide primer.


With the paint drying on 1919, our attention turned to 3606. We’ve had a sample bend section supplied to check which was close, but required some alteration to fit, which was carried out between Nick, Ernie and I. Some bends were altered and a section of material let in to extend the front section. this can now go back to the supplier so that they can make the full foot wide support pieces for this tank.



The heating coil pipe on 3606 was also completed, with Nick and Ernie having to recover one of the cutting rings from the compression fitting being used to complete the work. The bent sections where fitted together, then I welded them to the bosses on the tank, as would have originally been done.






That wraps up this week; next week maybe another coat on the 1919, or it could be something else. Lets see what the week and the weather hold for us. Thank for reading


Leave a Reply