Hello, and welcome to another Quorn wagon update. This week we’ve been starting a few smaller projects to tide us over until the next wagon arrives. We’ve got some during the week news to cover before I get to the weekend.
During the week, using the wheelset Nick took to Rothley on the lorry, the C&W team swapped the failed wheelst on the Coal Hopper, B425356. I’ll cover more work on this wagon later on.



Dave started the weekend with a touch of signwriting, finishing off the dock side of the tool van.




Nick and I relocated our other sign from our shed to the signposts next to the turntable. Charlie then painted the uncovered brown wood on the shed in black paint so this then matched the rest of the shed.



I then got stuck into a fact finding mission in the mess coach, ADB977107. For as long as we’ve been based at Quorn, we’ve used water carriers for our water. We’re now looking at re-commisioning part of the water system to be able to have a hand wash basin and the kitchen tap to be able to be used for cold water only. I started by removing some ceiling panels down the corridor and outside the toilets to have a look at what was already there.

Nick and Charlie went off to Rothley with the black paint to paint the replacement axleboxes and part of the Coal Hopper. Dave came to assist me in the coach, we found a long length of rubber hose used as a balance pipe between the first class water tank and the tank at the other end of the coach. This is a feature not normally found on Mk1s, and is a part of its converison to a mess coach. This got cut at a convenient point and bunged as it was found that the north end tank is unserviceable. While above the ceiling I also tidied a few loose lighting cables.



Sunday saw Nick go off to Rothley again to paint the yellow bearing end caps on the Coal Hopper axles. This now makes the vehicle fit to go back into traffic, having now passed its annual exam.
Armed with supplies from Screwfix, I stayed at Quorn to start some plumbing in the coach. Starting at the south end toilet, I plumbed up the cold water tap removing any redundant pipework, and adding a freeze drain to prevent any damage in the winter.

I then made a start on the kitchen sink pipe run, but had to stop short of connecting this up as we plan to put in a UV Sterilizer. Again, this has a freeze drain off point as well.
Mark, Dan and Nick finished their day by scraping some of the leftover spoil from the nook and crannies of the Grampus wagons.


Thanks for reading, we’ll be back again next week for more of the same, although hopefully the Pipe wagon will come in. See you then!

Leave a Reply