Welcome to this week’s update and wasn’t it a hot weekend! We re-adjusted activites so the team didn’t melt. Our open weekend is 4 weeks away now, and we’ve started making prepartions for this by painting Kiki into a new livery. The Test Car has also gone to Rothley for an annual exam in preparation for our event
Oliver and I made a start on preparing so more planks for the Pipe, but after 2 we decided it was much too hot to continue.

Dave, Mark, Tom and Dan started stripping Kiki down to prepare the panels for paint using a mixture of scrapers, sanding and a trial of some spray on paint stripper from CTEC.







The team started applying paint to the tug and its removed panels, which I looked at the bed lifting gear which hasn’t worked since we’ve had Kiki. thankfully this was an empty hydraulic reservoir which was filled up.




I found some broken down insulation on the wires running to the pump so the hydraulic pump will be fully rewired. I also topped up the battery cells with deionised water.


It was just me on Sunday, so I re-coated all the panels on the tug and those removed. At the end of the day I re-assembled the panels on to the tug, so it is just waiting for detailing and the seat to be remade.


Hopefully its a bit cooler next week so we can get back on with the last planks in the floor of the Pipe. Thanks for reading, and see you next week!