16/03/25 – The Big Reveal…

Hello every one and welcome to another update from Quorn. This week we are finally able to reveal what we’ve been teasing for a little while, what is actually happening to CEGB 48521. The tank train also had the wash and brush up finished, and a work continued generally on the tanks we have in at the moment. Onto the reveal then…

With thanks to our friends at the National Wagon Preservation Group, we were tipped off about a frame less tank barrel at a transport yard near Retford. The barrel arrived on Monday 9th March, and was dropped into place on the CEGB 48521 that’s just arrived from Foxfield. After a bit of careful nudging, the outlet flange was able to be bolted up to the discharge pipe of the chassis, locating the tank in the correct place. Despite being one barrel from Hurst Nelson and the chassis from Charles Roberts, the two fitted together well and await some parts to be made, and the barrel to be welded to the chassis. One of the pictures is courtesy of Jamie Swanson who kindly dropped in to assist.

Further thanks to Chris at NWPG, we now know the identity of both the chassis and the rest of the identity of the barrel. When the barrel is painted, it will continue to carry 3606 and the tank will used this identity going forward. The chassis used to carry 3797, so we shall make a small nod to its history in some way. It was found that there were no records for 3606 beyond 1975, so the barrel has been without wheels for at least 50 years!

We’ve now taken delivery of 6 hardwood door ‘noggins’ (top door frames) for the vans, which will help us finish the work on the 4 currently at Rothley. These will be stored until the vans make their way back to Quorn.

Dave and I concentrated on washing 3606 in the yard, making it a bit more respectable. We used some new chemicals which worked very well at getting the decades of built up grime off the tank. The paint has held up quite well considering it is likely to be is only coat!

While we did this, Nick, Ernie, Harry and Charlie fitted buffers to the north end of 3621 and dismantled a vacuum cylinder, getting it ready to fit to 3606.

A small shunt round in the morning moved 3606 into the dock, this was done by hand to reduce the risk of the barrel shifting at this early stage. Nick and Ernie made a start freeing the UIC screw couplings fitted to 3606.

Harry and new recruit Brad used the needle gun, hammer and chisels to descale the pockets adjacent to the buffers on 3621. We’ve not quite worked out why they’ve been designed as they are has they are quite the trap for water and other rubbish! Ernie also got stuck in on the action, removing two of the splash guards from 3621 and starting to chip away at the scale. Dan applied some primer to 3606, in one of the areas not got to before the barrel was fitted.

Oliver, Tom, Charlie, Mark and I concentrated on the west side of the tanks, running down each one with and cleaning all the grime off them. The new snowfoam from Jennychem worked very well at loosening the accumulated dirt, so it was a very worthwhile purchase!

That wraps up what has been a quite exciting week! We’ve now got a lot of cleaning down and preparation to do to get the tanks ready, but they are going to look fantastic! Join us again next weekend for another installment, thanks for reading!

Comments

Leave a Reply