Hello and welcome to the first May Bank Holiday update from us! This week, we’ve been fixing some arising work on the Dogfish, which was picked up after their annual exams.
On Saturday, the team started by identifying 5 spare buffers from our stash to replace those identified as failed on the wagons. Nick, Mark and I worked on the buffers, using the oxy/propane to heat the nuts up prior to removal.



Thomas, Dan and Tom started the process of oiling the wagons, starting with the doors, their oil pots and then moving onto the oiling the brake rigging and handbrake mechanisms. Their size was an advantage here!
While the hot spanner was out, we also tightened up some brake safety loops the had become loose.

Thomas, Nick, David and I were on site on Sunday, and I started with a bit of signwriting!


The south end of DB986166 was reported as having no brake safety loops. Nick, David and Thomas found some and fitted them to the wagon to make this complete.



Having finished the D plate I was signwriting, I started to take a look at the Generator again, draining some of the fuel tank to check the contents, and replacing the engine fuel filter and bleeding the fuel system up to the injector pump. I also replaced the rocker cover gasket.

Monday was more work on the Dogfish, taking a closer look at some of the stiffer doors and further oiling them up as best as access permisses. Oh to have a pit! Thankfully some of the doors freed off an amount which should help when they come to be used in the near future.



I think that covers this weekend. 5 buffers have been changed, 21 doors have been maintained, one D plate painted and 3 safety loops fitted. 5 of the Dogfish have now re-entered traffic to jon DB993412, with the 6th one awaiting replacement wheelsets. Next week, weather dependent we’ll be looking at some box van roofs, and there is still one D plate to signwrite. Thanks for reading!