31/5/26 – One more coat..

Written by

in

Hello everyone and welcome to this weekend’s update from Quorn. As you could expect its been all go on the tank front, thanks to co-operative weather, with both tanks looking good in their black top coat.

With just me holding down the fort on Saturday, it was down to me to get both tanks into top coat, spraying both barrels top to bottom and all underframe pockets. Nick and Charlie each had a go with the spray gun on the underframes.

Charlie undertook a pad exam on both the Conflat and Lowfit with no issues found and also oiled all the brake rigging.

We noticed that the pins in part of the brake rigging on 3854 were too long for their intended function, we set Ernie onto cutting them down and re-drilling the split pin hole. Nick and James refitted the pins once they’d all been cut down.

Dave and I made a start on second coat on 3854, this time with Oliver assisting. Oliver has expressed an interest in learning how to spray paint, and we are only too happy to pass on the skills. After talking through the set up, Dave and Oliver took the reigns in applying the paint, as I got a bit distracted…

To celebrate an upcoming birthday I put on a BBQ for the gang with plenty of food to go round. The team were well equipped to assist with the eating but also helped a lot with prep and the washing up!

The rest of the gang set to work in the GUV, removing a woodworking machine and rearranging the paint cupboards to give some more room for storage. Dan also got the two repaired splash guards for 3689 painted up into undercoat, ready for a coat of gloss.

Dave and Oliver ran out of time to get 3689 up into its second coat, so that’s what we’ll focus on next week. Join us then and see what else we get up to!

Comments

Leave a Reply