Evening all, and thanks for joining us for another update. With us settling into the colder and wetter months, we’re re-adjusting what we can do, including using the air tools at different times, and more heating and welding. This week has been more of catching up on a few little jobs, but we have been able to make some more progress on the Tube
We’ve taken delivery of another trailer, kindly donated through David Putt and the Loughborough station team. It was built in 1962 by Reliance, and we think it was used by the Post Office in Loughborough. Charlie and I wasted no time in checking it over, greasing the bearings and checking the brakes. It was delivered with a T bar on the handle which we don’t have the ability to couple with so Charlie cut it off and welded an eye onto the shaft. Its a fairly easy trailer to maneuver even by hand so should end up being quite useful!





Ernie set to work re-assembling the oxy-propane set with new 20m hoses which he then set up to continue making additional Not to be moved boards which we can use with our icicles. Charlie welded these together, after which Nick and Ernie adjusted the position of these when fitted to a vehicle.





Dave cleaned down the metalwork on both ends of the Tube then primed them in preparation to fit new wood work which has been ordered.





After repairing the gate last week, Mark, Tom and Oliver gave it, and some of the turntable a coat of white gloss. Oliver also repainted the red spot on the gate.




Dan completed the signwriting on B854782, then pieced together a template to do some other signwriting another day.

We unloaded the tent from the back of George into the Palshocvan, after which Charlie put it on charge, re-greased the bearings and adjusted the brakes.

With 1408 currently sat in the yard, Dave decided to give the Shell and BP logos a clean over then a coat of varnish, plus touched in some of the black paint.






Charlie and I took a look at Hector’s original battery. The battery is scrap, and I’m looking at an alternative solution to power him which may involve the battery box. We stripped down the battery and found the box to have no bottom left at all… Oh dear.

Dave, Charlie, Ernie and Nick did some more needle gunning on the Tube underframe which had some primer applied.






Nick found one last lamp part for Ernie to tackle, which saw Charlie trying to weld a new tank bottom on..


As always, thank you for reading and we look forward to you joining us again next week to see what we get up to!


Leave a Reply