Hello, as we head into November the LNER Tube wagon gets some more primer whilst the site has had a good tidy-up.
Saturday Nick and Charlie spent most of the day sorting scrap timber, removing any metalwork and collating it onto the pile ready for adding to the bonfire.





On Sunday Dan did a bit of signwriting on the West side of Shocvan B854782.



Mark, Tom and Oliver continued with some needle gun cleaning of the metalwork on the LNER Tube wagon E301588.





Ernie painted the four floor retention metal strips in gloss black.


I salvaged the metalwork, nuts and bolts from the old replica open container parts that we’ve decided are too far gone to try and re-build. The rotten wood was consigned to the bonfire pile whilst a few of the more solid planks were stored away with the metalwork for future use.







Mark, Tom and Oliver applied some red-oxide primer to the areas of the Tube wagon framework that they had cleaned up.




It was great to see the LMS 8F 48305 back in traffic this weekend; looking the part during a visit into the yard at Quorn to shunt the van train.

Thanks for reading, join us again soon, all the best, Dave