Hello everyone, and thanks for joining us for this week’s happenings from Quorn South Yard. Some more signwriting has taken place on 3854 and we’re getting ready for starting the work on the van train.

I started off by putting the number on the dockside of 3854, I had every intention of doing some more but got a little distracted!

Ernie and Nick started sorting through some recently donated hand tools to file them, and then moved onto sorting out our spanner collection and segregating the Whitworth and the metric spanners.

Ernie and I got to making some more label clip mounting blocks for stock, with Ernie cutting the board downs down to shape. I then put each block through the planer/thicknesser a few times to get them to the correct thickness.

Nick and Charlie went to collect 8 sheets of plywood for us to use in the repairs of the box vans, Ernie, Daniel and I went to assist with unloading them to store until required in the Palshocvan.

After tea, we got to clearing room in B852838 and B854782 moving the parcels out of the way. We then started undoing the bolts from the side sheet in B854782. Fortunately we’ve been here before and all but a few bolts undid.

For B852838, the panel we are replacing hasn’t been out before so is believed to be original fitment. We had to split each bolt and nut to be able to loosen the board sufficiently. the final act in this van was to use a small circular saw to cut the side sheet which was originally made the full length of the side. Easy for construction, however makes replacement a bit trickier!

That wraps up this weekends activities. One last reminder that next weekend is the Reunification Weekend where you can take trips on both halves of the railway linked by heritage rail replacement bus. We’ll have Test Car 2 open for you to visit, and we’ll be replacing the sides on the two vans some people can see what we do. Do stop us and ask question about the wagons or indeed the Test Car! See you then